Page 26 - Ekonomija i Biznis_juli-avgust 2016.indd
P. 26

РWУAБTРEИRКAАND THE HISTORY OF SKOPJE

HYDROELECTRIC POWER PLANT KOZJAK – PRODUCTION OF ELEC-
TRICITY AND REDUCTION OF THE DAMAGESCAUSED BY FLOODS

   The water power of Treska has long attracted the              struction of the Hydroelectric Power Plant “Kozjak”
attention of the technical intelligence and the busi-            as a priority immediately after the construction of
nessmen. A general study for utilization of the wa-              the thermal power station Bitola. The study for regu-
ters of the river Treska at the exit of the canyon near          lation and control of the river Vardar, prepared by
Skopje was prepared in 1930, and the project for the             “Norconsult” – Norway in 1969, for the needs of the
dam and the hydroelectric power plant “Matka” was                United Nations, and with the Development Program,
realized in the period from 1935 until 1938 by the aca-          two useful effects are stipulated with the construc-
demician professor Milan Pechinar.                               tion of the dam “Kozjak”:

   The med-term development plan of the Republic                    - benefit from the reduced damages caused by
of Macedonia, and the Program for Construction of                floods,
Power Facilities 1983 – 1990, determines the con-
                                                                    - production of electricity.
The weather conditions in the location were
                variable, with a strong rain and thunders, and   in terms of security from the reviews types of dams. The
                our only salvation were the hut and the sheep-   most eminent professionals from former Yugoslavia ex-
                fold of uncle Fejzi, where we were treated with  pressed their opinion for this type, as well as our academi-
                homemade buttermilk. The road was in very        cians, the Institute of Earthquake Engineering and Engi-
bad condition, and for this reason we contacted the mili-        neering Seismology, professors from the faculties for civil,
tary command in Nish, to use their helicopter in order to        electrical and mechanical engineering.
transfer a large container to the location Kozjak, as a shel-
ter and protection against storms.                                  Preparation of a main project
                                                                    On the basis of the obtained results from the field and
    The first thing we did is a census of the entire docu-       laboratory investigations conducted by EMO-Ohrid, a
mentation. Ground investigations of the hydroelectric            main project is prepared for all facilities of the hydroelec-
power plant “Kozjak” were performed in several stages,           tric power plant “Kozjak”. The main holder of the terrain
from 1965 until 1979, and from 1981 until 1986.                  and laboratory investigations were the Geological Institute
                                                                 – Skopje, the Institute for Civil Engineering Macedonia and
    During the field investigations and the design, and in       the Institute of Earthquake Engineering and Engineering
the interest of the security and the safety of the premises,     Seismology – Skopje.
experience and knowledge were used from the modern                  Revision of the main project
science in our country and in the world, for construction           On 27.2.1990 revision of the complete documentation
of such type of facilities.                                      about the hydroelectric power plant Kozjak was per-
                                                                 formed in Energoproekt – Belgrade, with the final conclu-
    Selection of the dam type                                    sion that the facility is prepared for construction. After
    A decision is made to apply a stone-filled dam with clay     the provision of the construction assets, on 31.8.1994 the
core for the enclosure Kozjak, as the most favorable type        President of the Republic of Macedonia, Kiro Gligorov, set
                                                                 the foundation stone for the construction of the hydro-
                                  MA Nikola Popovski,            electric power plant “Kozjak”.
                                  former Director of the Sec-       The commissioning of the hydroelectric power plant
                                  tor for Investments and        Kozjak, that is, the first filling of the reservoir lake was
                                  Construction of Sources        performed in December 2003.
                                  within Electro Skopje             The dam and the hydroelectric power plan Kozjak
                                                                 are located on the river Treska, approximately 25km up-
                                      The fieldwork took place   stream from its confluence into the Vardar river and ap-
                                  with a lot of difficulty. Ev-  proximately 16 kilometers upstream the existing dam Mat-
                                  erything was carefully per-    ka, at a distance of 45km from Skopje. The dam enables a
                                  formed on the ground be-       total accumulation space of 550 х 106 m3 water, of which
                                  cause there were a lot of      260 х 106 m3 is a used space, and 100 х 106 m3 is an invio-
                                  snakes of the species vipera   lable retention area and 190 х 106 m3 water is dead space.
     ammodytes, and we were obliged to bring injec-                 Skopje and the region of Skopje downstream, in the
     tions against the venom, however there were                 past one hundred years and longer, was flooded in 1885,
     also large falling rocks from the studies that              1916, 1935, 1937, 1962 and 1979.
     were undertaken with mining.

26 July-August 2016